Modular Portable Laboratories

  • A normal laboratory with a standard cleanroom inside
  • Built in 12 weeks for a 150 sqm
  • The cost per sqm is 50% of the cost of a new build
  • last 25 years +
  • Do not require complex planning permission as they are Mobile
  • Can be located on Car parks or on top of an existing building
  • Only need a concrete floor and supplies connections
  • Fully validated / tested at the manufacturing site
  • Only a relatively short time for the installation on site
  • External finish of choice to match customer individual requirement
Print | Sitemap
© Ubi Systems Ltd